STADIA Logo
 Woito–Turmi Road Design

Woito–Turmi Road Design

The Preparation of Concept Design, Tender Document, and Engineering Cost Estimate for the Woito–Turmi Road Projects (135 km) was undertaken with a focus on delivering comprehensive planning and documentation. The project scope included concept design development, preparation of tender documents, and detailed engineering cost estimation to support effective implementation. This work ensures proper corridor planning, technical accuracy, and readiness for construction procurement. The project has been completed, providing a solid foundation for the development of the Woito–Turmi Road corridor.